Locked History Actions

Diff for "Projectos/MuonTomography/UCoimbraProject"

Differences between revisions 2 and 18 (spanning 16 versions)
Revision 2 as of 2018-07-28 06:47:56
Size: 2050
Editor: sofia
Comment:
Revision 18 as of 2021-08-05 19:04:57
Size: 4074
Editor: sofia
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
''' Tomography of LIP-Coimbra ''' == Tomography of LIP-Coimbra ==
== Recent data acquisitions ==
For more details, check the [[https://docs.google.com/spreadsheets/d/1WxVLWr1y5vuZrZOi3eDeN60oclcYZjWt9hesrLpQuj0/edit?usp=sharing|logbook]].
||||||||||||||||<tablewidth="&quot" tablestyle="&quot; &amp; quot;text-align:center; &amp; quot; &quot; ;99%&quot"style="&quot;text-align:center&quot;">'''MUTOM data acquisitions''' ||
||Year ||Duration ||Trigger planes ||Spacing (cm) ||Localization ||Orientation (deg) ||Alignment ||Gains ||
||<style="&quot;text-align:center&quot;" |5>2020 ||01 Jun - 27 Jul ||1&2 ||14.5 ||default, table ||0 ||no info ||[[attachment:gains_default.xlsx|default]] ||
||27 Jul - 05 Sep ||1&2 ||33.5 ||default, trolley ||90 ||[[attachment:alignment.xlsx|info]] ||[[attachment:gains_default.xlsx|default]] ||
||05 Sep - 30 Sep ||1&2 ||33.5 ||open sky, trolley ||0 ||[[attachment:alignment.xlsx|info]] ||[[attachment:gains_default.xlsx|default]] ||
||30 Sep - 12 Nov ||1&2 ||33.5 ||default, trolley ||45 ||[[attachment:alignment.xlsx|info]] ||[[attachment:gains_default.xlsx|default]] ||
||12 Nov - 22 Dec ||1&2,2&3,1&3, corepix ||33.5 ||default, trolley ||45 ||[[attachment:alignment.xlsx|info]] ||[[attachment:gains_default.xlsx|default]] ||
||<style="&quot;text-align:center&quot;" |4>2021 ||14 Jan - 30 Mar ||1&2,2&3,1&3, corepix ||33.5 ||default, trolley ||45 ||[[attachment:alignment.xlsx|info]] ||[[attachment:gains_15Jan2021.xlsx|gains1]] ||
||30 Mar - 23 Apr ||1&2,2&3,1&3, corepix ||33.5 ||default, trolley ||45 ||aligned ||[[attachment:gains_15Jan2021.xlsx|gains1]] ||
||24 Apr - 14 May ||1&2,2&3,1&3, corepix ||33.5 ||default, trolley ||45 ||aligned ||[[attachment:gains_24Apr2021.xlsx|gains2]] ||
||14 May - ||1&2,2&3,1&3, corepix ||33.5 ||default, trolley ||45 ||aligned ||[[attachment:gains_14May2021.xlsx|gains3]] ||
Line 4: Line 17:



== 2021 - 15 a 17 Jun - test self-trigger / cable change / gas recirculation ==
back to normal at 17h of July 20 (not clear the intermediate state)



== Old data acquisitions ==
Line 32: Line 54:
The master thesis of Vitor (USP-S.Carlos) is based on this data [[attachment:Victor-mestrado.pdf|The master thesis of Vitor (USP-S.Carlos) is based on this data]]

Tomography of LIP-Coimbra

Recent data acquisitions

For more details, check the logbook.

MUTOM data acquisitions

Year

Duration

Trigger planes

Spacing (cm)

Localization

Orientation (deg)

Alignment

Gains

2020

01 Jun - 27 Jul

1&2

14.5

default, table

0

no info

default

27 Jul - 05 Sep

1&2

33.5

default, trolley

90

info

default

05 Sep - 30 Sep

1&2

33.5

open sky, trolley

0

info

default

30 Sep - 12 Nov

1&2

33.5

default, trolley

45

info

default

12 Nov - 22 Dec

1&2,2&3,1&3, corepix

33.5

default, trolley

45

info

default

2021

14 Jan - 30 Mar

1&2,2&3,1&3, corepix

33.5

default, trolley

45

info

gains1

30 Mar - 23 Apr

1&2,2&3,1&3, corepix

33.5

default, trolley

45

aligned

gains1

24 Apr - 14 May

1&2,2&3,1&3, corepix

33.5

default, trolley

45

aligned

gains2

14 May -

1&2,2&3,1&3, corepix

33.5

default, trolley

45

aligned

gains3

2021 - 15 a 17 Jun - test self-trigger / cable change / gas recirculation

back to normal at 17h of July 20 (not clear the intermediate state)

Old data acquisitions

A RPC based Muon Telescope has been operating in the LIP-Coimbra detector laboratory for many years. It is used to test each new detector plane that is produced there. We can use the data also to image the building of the UCoimbra Physics department building.

There is a lot of data available from the detector test muon telescope at Coimbra.

This is a 2.0 m x 0.5 m x 0.5 m telescope, with 4 planes at Z=(2.25,6.75;49.75,52.25)cm.

The new detector planes are at 143 cm for testing, and do not participate in the trigger.

  • The data consists on (time, charge) x 2 ends x 15 strips x 4 RPC planes
  • The trigger is a coincidence, within 50 ns, of 1(/2) top and 1(/2) bottom signals
  • The event T0 is defined as the minimum of the times (T1) on the trigger side
  • The two top planes are 4 gap RPCs, the two lower are 10 gaps RPCs, sharing HV
  • Monitoring has 3 HV, 4 gas flux, 1 current + enviorment at test plane (8T, 1P, 1H)

Some pre-treated data is in: www.coimbra.lip.pt/~alberto/data.tar.gz with format:

  • Ano, mes, dia, hora, minuto, segundo,
  • Posição longitudinal P1, P2, P3, P4, - diferença de tempo, escala de TDC bins
  • Posição transversal de P1, P2, P3, P4, - 1 de 15 strips de 30 mm (0.4 mm de intervalo)
  • Tempos do P1, P2, P3, P4, sem calibrar - média dos tempos, usada no trigger
  • Outras 128 variáveis de um plano testado a 143 cm, que não esta no trigger.
  • A posição vertical é P1=49.75 cm, P2=52.25 cm, P3=2.25 cm, P4=6.75cm.

=> Good for practicing data cleaning, data reconstruction and imaging techniques

=> Good plans for master thesis, smaller student projects and cases for outreach

The master thesis of Vitor (USP-S.Carlos) is based on this data



Links