Size: 629
Comment:
|
Size: 1286
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
=== Meetings === | == Meetings - Activities - Campaigns == |
Line 3: | Line 3: |
==== 2018-07-26 ==== '''Cristina Cârloganu Seminar''' |
<<BR>> __'''2018-07-26'''__ ==== Cristina Cârloganu Seminar ==== |
Line 9: | Line 9: |
Presentations by C. Cârloganu (not exactly the one shown in the seminar but close): | Presentations (not exactly the one shown in the seminar but close): - [[attachment:Muography - Cristina Carloganu.pdf|"Muography - C. Cârloganu"]] - [[attachment:1002_05_Cristina_Carloganu.pdf|"Muography on Puy de Dôme - C. Cârloganu"]] <<BR>> ==== Visit to Lousal ==== Visit to the Living Science Center of Lousal and the Lousal Mine Photos: [[Projectos/MuonTomography/VisitLousal|Visit to Lousal]] |
Line 13: | Line 25: |
==== 2019-02-19 ==== | |
Line 15: | Line 26: |
'''Meeting at Ciência Viva in Lousal Mine'''<<BR>> | __'''2019-02-19'''__ ==== Meeting at Ciência Viva in Lousal Mine ==== |
Line 17: | Line 29: |
Agenda and presentations: https://indico.lip.pt/event/549/ | Agenda and presentations: [[https://indico.lip.pt/event/549/|[Link]>]] |
Line 21: | Line 33: |
Photos: [[https://photos.app.goo.gl/fJjdATVziGxcNerk7| Prototype Instalation in Lousal Mine]] | Photos: [[https://photos.app.goo.gl/fJjdATVziGxcNerk7|Prototype Instalation in Lousal Mine]] <<BR>> <<BR>> __'''2019-06-04/05'''__<<BR>> ==== First Geophysical Campaign ==== These first two-day campaign involved the following geophysical methods: 2D seismic (using geophones), georadar (with 2 antennas working in 100 Hz) and photogravimetry (using a drone). |
Meetings - Activities - Campaigns
2018-07-26
Cristina Cârloganu Seminar
Abstract: "Muography: from dreams to reality"
Presentations (not exactly the one shown in the seminar but close):
- "Muography on Puy de Dôme - C. Cârloganu"
Visit to Lousal
Visit to the Living Science Center of Lousal and the Lousal Mine
Photos: Visit to Lousal
2019-02-19
Meeting at Ciência Viva in Lousal Mine
Agenda and presentations: [Link]>
LIP News: "Protótipo instalado na mina do Lousal"
Photos: Prototype Instalation in Lousal Mine
2019-06-04/05
First Geophysical Campaign
These first two-day campaign involved the following geophysical methods: 2D seismic (using geophones), georadar (with 2 antennas working in 100 Hz) and photogravimetry (using a drone).