Locked History Actions

Diff for "Projectos/MuonTomography/Meetings"

Differences between revisions 36 and 39 (spanning 3 versions)
Revision 36 as of 2019-06-18 17:57:10
Size: 1623
Comment:
Revision 39 as of 2020-02-04 15:33:29
Size: 1940
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
<<BR>> __'''2018-07-26'''__
Line 3: Line 4:
<<BR>>
__'''2018-07-26'''__
Line 6: Line 5:
Line 18: Line 16:
Line 23: Line 20:
Line 27: Line 23:
Line 28: Line 25:
Line 35: Line 31:
<<BR>>
<<BR>>
<<BR>> <<BR>>
Line 40: Line 34:
Line 41: Line 36:
This first two-day campaign took place in a selected area on the surface around the Valdemar Well and involved the following geophysical methods: <<BR>>
Line 42: Line 38:
This first two-day campaign took place in a selected area on the surface around the Valdemar Well and involved the following geophysical methods: <<BR>>
Line 50: Line 45:

<<BR>>

__'''2019-12-16'''__

==== 2º Meeting at Coimbra University ====

The lab where the detectors and the new telescope are being built was visited.<<BR>>
The progress of the work since the last meeting was reviewed and the next steps were discussed.


Photos: LIP-Coimbra Lab and almost-finished telescope

Meetings - Activities - Campaigns


2018-07-26

Cristina Cârloganu Seminar

Abstract: "Muography: from dreams to reality"

Presentations (not exactly the one shown in the seminar but close):

- "Muography - C. Cârloganu"

- "Muography on Puy de Dôme - C. Cârloganu"


Visit to the Lousal

Visit to the Living Science Center of Lousal and the Lousal Mine

Photos: Visit to the Lousal (by Pedro Teixeira)


2019-02-19

Meeting at Ciência Viva in Lousal Mine

Agenda and presentations: [Link]>

LIP News: "Protótipo instalado na mina do Lousal"

Photos: Prototype Instalation in Lousal Mine (by Pedro Assis)



2019-06-04/05

First Geophysical Campaign

This first two-day campaign took place in a selected area on the surface around the Valdemar Well and involved the following geophysical methods:

  • seismic 2D (using geophones),
  • georadar (with 2 antennas working in 100 MHz),
  • and photogrammetry (using a drone).

The photographic record was made by Vanessa Pais, geologist of the Living Science Center of Lousal.

Photos: First Geophysical Campaign in Lousal


2019-12-16

2º Meeting at Coimbra University

The lab where the detectors and the new telescope are being built was visited.
The progress of the work since the last meeting was reviewed and the next steps were discussed.

Photos: LIP-Coimbra Lab and almost-finished telescope