Size: 202
Comment:
|
Size: 1402
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
=== Meetings === | == Meetings - Activities - Campaigns == |
Line 3: | Line 3: |
Meeting at Ciencia Viva in Lousal Mine Agenda and presentations: https://indico.lip.pt/event/549/ LIP news: http://www.lip.pt/?section=press&page=news-details&id=743&ref=homepage |
<<BR>> __'''2018-07-26'''__ ==== Cristina Cârloganu Seminar ==== Abstract: [[https://indico.lip.pt/event/468|"Muography: from dreams to reality"]] Presentations (not exactly the one shown in the seminar but close): - [[attachment:Muography - Cristina Carloganu.pdf|"Muography - C. Cârloganu"]] - [[attachment:1002_05_Cristina_Carloganu.pdf|"Muography on Puy de Dôme - C. Cârloganu"]] <<BR>> ==== Visit to the Lousal ==== Visit to the Living Science Center of Lousal and the Lousal Mine Photos: [[Projectos/MuonTomography/VisitLousal|Visit to the Lousal]] <<BR>> __'''2019-02-19'''__ ==== Meeting at Ciência Viva in Lousal Mine ==== Agenda and presentations: [[https://indico.lip.pt/event/549/|[Link]>]] LIP News: [[http://www.lip.pt/?section=press&page=news-details&id=743&ref=homepage|"Protótipo instalado na mina do Lousal"]] Photos: [[https://photos.app.goo.gl/fJjdATVziGxcNerk7|Prototype Instalation in Lousal Mine]] <<BR>> <<BR>> __'''2019-06-04/05'''__<<BR>> ==== First Geophysical Campaign ==== These first two-day campaign involved the following geophysical methods: <<BR>> * 2D seismic (using geophones), * georadar (with 2 antennas working in 100 Hz), * and photogrametry (using a drone). Photos: [[Projectos/MuonTomography/GeoCampaign1|First Geophysical Campaign in Lousal]] |
Meetings - Activities - Campaigns
2018-07-26
Cristina Cârloganu Seminar
Abstract: "Muography: from dreams to reality"
Presentations (not exactly the one shown in the seminar but close):
- "Muography on Puy de Dôme - C. Cârloganu"
Visit to the Lousal
Visit to the Living Science Center of Lousal and the Lousal Mine
Photos: Visit to the Lousal
2019-02-19
Meeting at Ciência Viva in Lousal Mine
Agenda and presentations: [Link]>
LIP News: "Protótipo instalado na mina do Lousal"
Photos: Prototype Instalation in Lousal Mine
2019-06-04/05
First Geophysical Campaign
These first two-day campaign involved the following geophysical methods:
- 2D seismic (using geophones),
- georadar (with 2 antennas working in 100 Hz),
- and photogrametry (using a drone).