Size: 1591
Comment:
|
Size: 2586
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
<<BR>> __'''2018-07-26'''__ | |
Line 3: | Line 4: |
<<BR>> __'''2018-07-26'''__ |
|
Line 6: | Line 5: |
Line 18: | Line 16: |
Line 23: | Line 20: |
Line 27: | Line 23: |
Line 28: | Line 25: |
Line 35: | Line 31: |
<<BR>> <<BR>> __'''2019-06-04/05'''__<<BR>> ==== First Geophysical Campaign ==== This first two-day campaign took place in a selected area on the surface around the Valdemar Well and involved the following geophysical methods: <<BR>> * seismic 2D (using geophones), * georadar (with 2 antennas working in 100 MHz), * and photogrammetry (using a drone). The photographic record was made by Vanessa Pais, geologist of the Living Science Center of Lousal. Photos: [[https://photos.app.goo.gl/hN1qLn3sDuVJTfJM7|First Geophysical Campaign in Lousal]] |
|
Line 36: | Line 47: |
__'''2019-12-16'''__ ==== 2nd LouMu Meeting at Coimbra University ==== The LIP Lab at Coimbra University where the detectors and the new telescope are being built was visited.<<BR>> The progress of the work since the last meeting was reviewed and the next steps were discussed. Photos: [[https://photos.app.goo.gl/zC33ZTZq7ndVXyBPA|LIP-Coimbra Lab and "almost-finished" Muon Telescope]] <<BR>> __'''2020-11-23'''__ ==== 3rd LouMu Meeting ==== Online meeting with the !LouMu members from Minho, Coimbra, Lisboa and Évora.<<BR>> Discussion of the developments of the !CorePix telescope, the muon tomography simulations and the geophysic work. |
|
Line 39: | Line 71: |
__'''2019-06-04/05'''__<<BR>> ==== First Geophysical Campaign ==== |
<<BR>> |
Line 42: | Line 73: |
These first two-day campaign involved the following geophysical methods: <<BR>> * 2D seismic (using geophones), * georadar (with 2 antennas working in 100 Hz), * and photogrametry (using a drone). |
__'''2020-11-23'''__ |
Line 47: | Line 75: |
The photographic record was made by Vanessa Pais, geologist of the Living Science Center of Lousal. | ==== 4th LouMu Meeting - Progress Status & PTDC ==== |
Line 49: | Line 77: |
Photos: https://photos.app.goo.gl/hN1qLn3sDuVJTfJM7 | Meeting online with the !LouMu members <<BR>> Discussion and presentation of the progress status of all work teams. Discussion of the PTDC application for project funding. |
Line 51: | Line 81: |
[[Projectos/MuonTomography/GeoCampaign1|First Geophysical Campaign in Lousal]] |
<<BR>> |
Meetings - Activities - Campaigns
2018-07-26
Cristina Cârloganu Seminar
Abstract: "Muography: from dreams to reality"
Presentations (not exactly the one shown in the seminar but close):
- "Muography on Puy de Dôme - C. Cârloganu"
Visit to the Lousal
Visit to the Living Science Center of Lousal and the Lousal Mine
Photos: Visit to the Lousal (by Pedro Teixeira)
2019-02-19
Meeting at Ciência Viva in Lousal Mine
Agenda and presentations: [Link]>
LIP News: "Protótipo instalado na mina do Lousal"
Photos: Prototype Instalation in Lousal Mine (by Pedro Assis)
2019-06-04/05
First Geophysical Campaign
This first two-day campaign took place in a selected area on the surface around the Valdemar Well and involved the following geophysical methods:
- seismic 2D (using geophones),
- georadar (with 2 antennas working in 100 MHz),
- and photogrammetry (using a drone).
The photographic record was made by Vanessa Pais, geologist of the Living Science Center of Lousal.
Photos: First Geophysical Campaign in Lousal
2019-12-16
2nd LouMu Meeting at Coimbra University
The LIP Lab at Coimbra University where the detectors and the new telescope are being built was visited.
The progress of the work since the last meeting was reviewed and the next steps were discussed.
Photos: LIP-Coimbra Lab and "almost-finished" Muon Telescope
2020-11-23
3rd LouMu Meeting
Online meeting with the LouMu members from Minho, Coimbra, Lisboa and Évora.
Discussion of the developments of the CorePix telescope, the muon tomography simulations and the geophysic work.
2020-11-23
4th LouMu Meeting - Progress Status & PTDC
Meeting online with the LouMu members
Discussion and presentation of the progress status of all work teams. Discussion of the PTDC application for project funding.