Locked History Actions

Diff for "Projectos/MuonTomography/Meetings"

Differences between revisions 27 and 37 (spanning 10 versions)
Revision 27 as of 2019-06-12 16:08:04
Size: 1402
Comment:
Revision 37 as of 2020-01-16 16:59:31
Size: 1881
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
<<BR>> __'''2018-07-26'''__
Line 3: Line 4:
<<BR>>
__'''2018-07-26'''__
Line 6: Line 5:
Line 18: Line 16:
Line 21: Line 18:
Photos: [[Projectos/MuonTomography/VisitLousal|Visit to the Lousal]]
Photos: [[Projectos/MuonTomography/VisitLousal|Visit to the Lousal]] (by Pedro Teixeira)
Line 27: Line 23:
Line 28: Line 25:
Line 33: Line 29:
Photos: [[https://photos.app.goo.gl/fJjdATVziGxcNerk7|Prototype Instalation in Lousal Mine]] Photos: [[https://photos.app.goo.gl/fJjdATVziGxcNerk7|Prototype Instalation in Lousal Mine]] (by Pedro Assis)

<<BR>> <<BR>>

__'''2019-06-04/05'''__<<BR>>

==== First Geophysical Campaign ====
This first two-day campaign took place in a selected area on the surface around the Valdemar Well and involved the following geophysical methods: <<BR>>

 * seismic 2D (using geophones),
 * georadar (with 2 antennas working in 100 MHz),
 * and photogrammetry (using a drone).

The photographic record was made by Vanessa Pais, geologist of the Living Science Center of Lousal.

Photos: [[https://photos.app.goo.gl/hN1qLn3sDuVJTfJM7|First Geophysical Campaign in Lousal]]
Line 36: Line 47:
<<BR>>
Line 38: Line 48:
__'''2019-12-16'''__
Line 39: Line 50:
__'''2019-06-04/05'''__<<BR>>
==== First Geophysical Campaign ====
==== 2º Meeting at Coimbra University ====
Agenda and presentations: [[https://indico.lip.pt/event/549/|[Link]>]]
Line 42: Line 53:
These first two-day campaign involved the following geophysical methods: <<BR>>
 * 2D seismic (using geophones),
 * georadar (with 2 antennas working in 100 Hz),
 * and photogrametry (using a drone).

Photos: [[Projectos/MuonTomography/GeoCampaign1|First Geophysical Campaign in Lousal]]
Photos: [[https://photos.app.goo.gl/fJjdATVziGxcNerk7|Prototype Instalation in Lousal Mine]] (by Pedro Assis)

Meetings - Activities - Campaigns


2018-07-26

Cristina Cârloganu Seminar

Abstract: "Muography: from dreams to reality"

Presentations (not exactly the one shown in the seminar but close):

- "Muography - C. Cârloganu"

- "Muography on Puy de Dôme - C. Cârloganu"


Visit to the Lousal

Visit to the Living Science Center of Lousal and the Lousal Mine

Photos: Visit to the Lousal (by Pedro Teixeira)


2019-02-19

Meeting at Ciência Viva in Lousal Mine

Agenda and presentations: [Link]>

LIP News: "Protótipo instalado na mina do Lousal"

Photos: Prototype Instalation in Lousal Mine (by Pedro Assis)



2019-06-04/05

First Geophysical Campaign

This first two-day campaign took place in a selected area on the surface around the Valdemar Well and involved the following geophysical methods:

  • seismic 2D (using geophones),
  • georadar (with 2 antennas working in 100 MHz),
  • and photogrammetry (using a drone).

The photographic record was made by Vanessa Pais, geologist of the Living Science Center of Lousal.

Photos: First Geophysical Campaign in Lousal


2019-12-16

2º Meeting at Coimbra University

Agenda and presentations: [Link]>

Photos: Prototype Instalation in Lousal Mine (by Pedro Assis)