Locked History Actions

Diff for "Projectos/MuonTomography/Meetings"

Differences between revisions 23 and 25 (spanning 2 versions)
Revision 23 as of 2019-06-08 23:44:11
Size: 998
Comment:
Revision 25 as of 2019-06-09 00:26:33
Size: 1286
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
== Meetings == == Meetings - Activities - Campaigns ==
Line 34: Line 34:
Line 36: Line 37:


__'''2019-06-04/05'''__<<BR>>
==== First Geophysical Campaign ====

These first two-day campaign involved the following geophysical methods: 2D seismic (using geophones), georadar (with 2 antennas working in 100 Hz) and photogravimetry (using a drone).

Meetings - Activities - Campaigns


2018-07-26

Cristina Cârloganu Seminar

Abstract: "Muography: from dreams to reality"

Presentations (not exactly the one shown in the seminar but close):

- "Muography - C. Cârloganu"

- "Muography on Puy de Dôme - C. Cârloganu"


Visit to Lousal

Visit to the Living Science Center of Lousal and the Lousal Mine

Photos: Visit to Lousal


2019-02-19

Meeting at Ciência Viva in Lousal Mine

Agenda and presentations: [Link]>

LIP News: "Protótipo instalado na mina do Lousal"

Photos: Prototype Instalation in Lousal Mine



2019-06-04/05

First Geophysical Campaign

These first two-day campaign involved the following geophysical methods: 2D seismic (using geophones), georadar (with 2 antennas working in 100 Hz) and photogravimetry (using a drone).