First communications setup tests at Lousal. '''First communications setup tests at Lousal'''.
Line 3: Line 3:
Goal: Evaluate the communications conditions at Lousal site, install a device to log room temperature and humidity. __Goal:__ Evaluate the communications conditions at Lousal site, install a device to log room temperature and humidity.
Line 14: Line 14:

First communications setup tests at Lousal.

Goal: Evaluate the communications conditions at Lousal site, install a device to log room temperature and humidity.

As there is no physical internet connection at the site, a GSM-based router was used to guarantee internet connection.

The router was installed in the guard house and a powerline link was established between the guard house and the logger device.

To communicate with the setup via a commercial supplier (NOS) a DDNS was created.