Size: 55
Comment: Comunications setup tests.
|
Size: 684
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
Describe Projectos/MuonTomography/Comunications here. | '''First communications setup tests at Lousal'''. __Goal:__ Evaluate the communications conditions at Lousal site, install a device to log room temperature and humidity. As there is no physical internet connection at the site, a GSM-based router was used to guarantee internet connection. The router was installed in the guard house and a powerline link was established between the guard house and the logger device. To communicate with the setup via a commercial supplier (NOS) a DDNS was created. * An email was created ( setup.lousal@gmail.com ) * Created a DDNS account at no-ip (lousal.ddns.net) * To access no-ip account (username: setup.lousal@gmail.com ) |
First communications setup tests at Lousal.
Goal: Evaluate the communications conditions at Lousal site, install a device to log room temperature and humidity.
As there is no physical internet connection at the site, a GSM-based router was used to guarantee internet connection.
The router was installed in the guard house and a powerline link was established between the guard house and the logger device.
To communicate with the setup via a commercial supplier (NOS) a DDNS was created.
An email was created ( setup.lousal@gmail.com )
- Created a DDNS account at no-ip (lousal.ddns.net)
To access no-ip account (username: setup.lousal@gmail.com )