Locked History Actions

Diff for "Projectos/MuonTomography/Communications"

Differences between revisions 1 and 5 (spanning 4 versions)
Revision 1 as of 2019-01-14 16:28:49
Size: 55
Editor: Jocafeno
Comment: Comunications setup tests.
Revision 5 as of 2019-01-14 17:26:57
Size: 684
Editor: Jocafeno
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
Describe Projectos/MuonTomography/Comunications here. '''First communications setup tests at Lousal'''.

__Goal:__ Evaluate the communications conditions at Lousal site, install a device to log room temperature and humidity.

As there is no physical internet connection at the site, a GSM-based router was used to guarantee internet connection.

The router was installed in the guard house and a powerline link was established between the guard house and the logger device.

To communicate with the setup via a commercial supplier (NOS) a DDNS was created.

 * An email was created ( setup.lousal@gmail.com )
 * Created a DDNS account at no-ip (lousal.ddns.net)
 * To access no-ip account (username: setup.lousal@gmail.com )

First communications setup tests at Lousal.

Goal: Evaluate the communications conditions at Lousal site, install a device to log room temperature and humidity.

As there is no physical internet connection at the site, a GSM-based router was used to guarantee internet connection.

The router was installed in the guard house and a powerline link was established between the guard house and the logger device.

To communicate with the setup via a commercial supplier (NOS) a DDNS was created.