Line 1: Line 1:
Describe Projectos/MuonTomography/Comunications here. First communications setup tests at Lousal.

Goal: Evaluating the communications conditions at Lousal site, install a device to log room temperature and humidity.

As there is no physical internet connection at the site, a GSM-based router was used to guarantee internet connection.

The router was installed in the guard house and a powerline link was established between the guard house and the logger device.

To communicate with the setup via a commercial supplier (NOS) a DDNS was created.
 - Create an email (setup.lousal@gmail.com)
 - Create a DDNS account at no-ip (lousal.ddns.net)
 - To access no-ip account (username: setup.lousal@gmail.com)
 

First communications setup tests at Lousal.

Goal: Evaluating the communications conditions at Lousal site, install a device to log room temperature and humidity.

As there is no physical internet connection at the site, a GSM-based router was used to guarantee internet connection.

The router was installed in the guard house and a powerline link was established between the guard house and the logger device.

To communicate with the setup via a commercial supplier (NOS) a DDNS was created.