Locked History Actions

Diff for "Projectos/AUGER/MARTA/B2015SimulationChallenge"

Differences between revisions 44 and 45
Revision 44 as of 2014-02-26 00:40:30
Size: 945
Editor: bernardo
Comment:
Revision 45 as of 2014-02-26 00:40:57
Size: 952
Editor: bernardo
Comment:
Deletions are marked like this. Additions are marked like this.
Line 16: Line 16:
   i Strategy for calibrating the new detectors. Expected precision of the relative and absolute calibration to be achieved should be provided. Means for validating the calibration should be discussed.    '''i. Strategy for calibrating the new detectors. Expected precision of the relative and absolute calibration to be achieved should be provided. Means for validating the calibration should be discussed.'''

Beyond 2015 Simulation Challenge

B2015 Simulation Challenge document (V7)

Info about available simulations


List of plots

3.1 Performance of individual stations

"The following information should be provided. As applicable to the item, quantitative values should be based on the analysis of individual stations using the reconstructed datasets at fixed energies (F) : 1019 eV and 1019.8 eV and for p, He, N and Fe primaries. The target for these metrics is the March meeting, with items (iii) and (v) having highest priority."

  • i. Strategy for calibrating the new detectors. Expected precision of the relative and absolute calibration to be achieved should be provided. Means for validating the calibration should be discussed.

  • ii The time resolution of the signal trace(s) and response time of the detector.