Locked History Actions

Diff for "Projectos/AUGER/MARTA/B2015SimulationChallenge"

Differences between revisions 38 and 39
Revision 38 as of 2014-02-26 00:37:40
Size: 875
Editor: bernardo
Comment:
Revision 39 as of 2014-02-26 00:37:56
Size: 865
Editor: bernardo
Comment:
Deletions are marked like this. Additions are marked like this.
Line 11: Line 11:
===== The following information should be provided. As applicable to the item, quantitative values "The following information should be provided. As applicable to the item, quantitative values
Line 14: Line 14:
is the March meeting, with items (iii) and (v) having highest priority. ===== is the March meeting, with items (iii) and (v) having highest priority."

Beyond 2015 Simulation Challenge

B2015 Simulation Challenge document (V7)

Info about available simulations


List of plots

3.1 Performance of individual stations

"The following information should be provided. As applicable to the item, quantitative values should be based on the analysis of individual stations using the reconstructed datasets at fixed energies (F) : 1019 eV and 1019.8 eV and for p, He, N and Fe primaries. The target for these metrics is the March meeting, with items (iii) and (v) having highest priority."

  • (i) Strategy for calibrating the new detectors. Expected precision of the relative and absolute

calibration to be achieved should be provided. Means for validating the calibration should be discussed.