Locked History Actions

Diff for "Projectos/AUGER/MARTA/B2015SimulationChallenge"

Differences between revisions 37 and 38
Revision 37 as of 2014-02-26 00:37:09
Size: 864
Editor: bernardo
Comment:
Revision 38 as of 2014-02-26 00:37:40
Size: 875
Editor: bernardo
Comment:
Deletions are marked like this. Additions are marked like this.
Line 11: Line 11:
The following information should be provided. As applicable to the item, quantitative values ===== The following information should be provided. As applicable to the item, quantitative values
Line 14: Line 14:
is the March meeting, with items (iii) and (v) having highest priority. is the March meeting, with items (iii) and (v) having highest priority. =====

Beyond 2015 Simulation Challenge

B2015 Simulation Challenge document (V7)

Info about available simulations


List of plots

3.1 Performance of individual stations

===== The following information should be provided. As applicable to the item, quantitative values should be based on the analysis of individual stations using the reconstructed datasets at fixed energies (F) : 1019 eV and 1019.8 eV and for p, He, N and Fe primaries. The target for these metrics is the March meeting, with items (iii) and (v) having highest priority. =====

  • (i) Strategy for calibrating the new detectors. Expected precision of the relative and absolute

calibration to be achieved should be provided. Means for validating the calibration should be discussed.