Locked History Actions

Diff for "Projectos/AUGER/MARTA/B2015SimulationChallenge"

Differences between revisions 35 and 36
Revision 35 as of 2014-02-26 00:35:58
Size: 686
Editor: bernardo
Comment:
Revision 36 as of 2014-02-26 00:36:17
Size: 696
Editor: bernardo
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:

----

Beyond 2015 Simulation Challenge

B2015 Simulation Challenge document (V7)

Info about available simulations


List of plots (lets try to insert here the plots...)

3.1 Performance of individual stations

The following information should be provided. As applicable to the item, quantitative values should be based on the analysis of individual stations using the reconstructed datasets at fixed energies (F) : 1019 eV and 1019.8 eV and for p, He, N and Fe primaries. The target for these metrics is the March meeting, with items (iii) and (v) having highest priority. ====