Locked History Actions

Diff for "Projectos/AUGER/MARTA/B2015SimulationChallenge"

Differences between revisions 32 and 33
Revision 32 as of 2014-02-22 00:47:24
Size: 264
Editor: bernardo
Comment:
Revision 33 as of 2014-02-26 00:33:10
Size: 681
Editor: bernardo
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
==== List of plots (lets try to insert here the plots...) ==== === List of plots (lets try to insert here the plots...) ===

==== 3.1 Performance of individual stations
The following information should be provided. As applicable to the item, quantitative values
should be based on the analysis of individual stations using the reconstructed datasets at fixed
energies (F) : 1019 eV and 1019.8 eV and for p, He, N and Fe primaries. The target for these metrics
is the March meeting, with items (iii) and (v) having highest priority. ====

Beyond 2015 Simulation Challenge

B2015 Simulation Challenge document (V7)

Info about available simulations

List of plots (lets try to insert here the plots...)

==== 3.1 Performance of individual stations The following information should be provided. As applicable to the item, quantitative values should be based on the analysis of individual stations using the reconstructed datasets at fixed energies (F) : 1019 eV and 1019.8 eV and for p, He, N and Fe primaries. The target for these metrics is the March meeting, with items (iii) and (v) having highest priority. ====